Project Overview:

Keystone Contracting Corp, one of the leading construction companies in NYC undertook a renovation project for a historic structure downtown. The project needed painting, facade work, and major repairs. Since our company prioritizes the safety of workers and high-quality service, our company opted for scaffolding rental services to boost productivity.

Client Profile:

Client: Historic Building Restoration, LLC

Location: Downtown Metropolitan Area 

Project Type: Façade Renovation and Repairs Duration: 6 months

The Challenge:  The structure is an architectural masterpiece but due to exposure to physical elements got worn out over the years. The facade was experiencing fast deterioration and needed comprehensive restoration services to get the building to its original beauty. However, restoration of the building’s facade requires access to various heights and other sections of the building for repairs, painting, and detailing. As a company that is committed to client satisfaction, safety is of utmost concern due to the building’s complex nature and age.

Keystone’s Solution:  Keystone Contracting Corp partnered with a professional scaffolding rental service to ensure the best material was used for the restoration. The partnership was to ensure we addressed the project’s unique needs. One of the perfect solutions we offered to aid and speed up the restoration process was providing scaffolding equipment. This was to ensure safe access for workers and equipment at various heights 

Implementation

Here’s a look at our implementation process:

Consultation

We started the process with a consultation. This helped us to understand the requirements, challenges, and objectives. Our consultation with the project’s owner formed the foundation of our customized solutions.

Project Assessment

Our assessment of the project includes an evaluation of the scope and nature of the renovation project. Identify the areas that need scaffolding for better accessibility. Also consider the height, layout, and complexity of the building’s facade

Scaffolding Selection

We chose the appropriate type of scaffolding system based on the project. We also considered factors like weight capacity, adjustability, and compatibility with the building’s structure.

Customized Scaffolding Design

We collaborated with the scaffolding provider to design a customized solution.  This was to ensure the design met the needs of the building’s architecture and also provided better accessibility for workers 

Vendor Selection

We selected one of the best scaffolding rental companies with a proven track record of safety and quality

Safety Planning

To further showcase our commitment to safety, we developed a comprehensive safety plan that outlines how the equipment will be erected, used, and dismantled safely. We also trained our workers on proper scaffolding usage, fall protection, and emergency procedures.

Permits and Regulation

Obtaining necessary permits and approvals for using scaffolding equipment from relevant authorities is of utmost importance. This was to ensure our company complies with the rules and regulations for historical buildings 

Scheduling

We coordinated with the scaffolding rental company to schedule the delivery and set up of the scaffolding equipment. We also ensured the scaffolding setup was well aligned with the project timeline for efficiency

Erection and Setup

Our skilled scaffolding professionals assembled the scaffolding system correctly and securely to help keep the scaffolding level, stable, and properly anchored to the building.

Inspection and Testing

We conducted thorough inspections before allowing workers to use it. This was important to test the scaffold’s stability and load-bearing capacity 

Safety Measures

Extra safety measures were carried out to ensure worker safety. These measures include fall protection, proper guardrails, and secure platforms 

Work Execution

To further restate our commitment to safety, we provided our workers with proper personal protective equipment (PPE). 

Progress Monitoring

To monitor the progress of the project, our team of experts conducted regular assessments. This was to ensure the efficiency of the setup and make the necessary adjustments to meet project milestones 

Adaptability

As the project progressed, we adjusted the scaffolding layout to fit changing needs. This ensures better provision of access to different parts of the façade.

Dismantling and Removal

When the project was complete, we dismantled the scaffolding by carefully following the manufacturer’s guidelines. We also prioritize safety by ensuring the equipment is disassembled safely and without damage to the building.

Final Inspections

We also conducted a final inspection of the building’s facade and the scaffolding site to ensure there was no damage 

Results

Here’s an overview of our results using the scaffolding equipment:

Better Productivity

The Scaffolding equipment provided a stable and secure platform for workers to perform their tasks at different heights. This helped boost productivity and ensure faster completion of the project 

Accessibility

The Scaffolding allowed workers to access various parts of the building that were difficult to reach. This was particularly important for the historical renovation projects which involve detailed work on different sections of the façade.

Efficiency

The scaffolding significantly improves the efficiency of the project by reducing the time it takes for workers to move between different areas. This led to faster completion of the renovation work.

Timely Completion

The scaffolding ensured simultaneous work on multiple areas of the building. This resulted in the project’s timely completion within its time frame.

Flexibility

The scaffolding systems were customized and adjusted to fit the specific requirements of the project. This adaptability was important for historic buildings with unique architectural features that need careful attention.

Quality of Work

With the scaffolding in place, workers were able to focus on performing their tasks with precision and attention to detail, resulting in a higher-quality renovation.

Minimized Disruption

The equipment helped minimize disruption to the surrounding area. It also contained the work within a confined space, reducing the chances of materials falling and causing harm to pedestrians.

Safety Assurance

Properly installed scaffolding provided a safe work environment for workers. It reduces the risks of accidents and injuries

Regulatory Compliance

When working on historical buildings, we understood there are specific regulations and guidelines to adhere to. Our scaffolding equipment helped in complying with these regulations to ensure the preservation of the building’s historic features.

Reduced Liability

The scaffolding helped reduce potential legal liabilities This ensured a safer environment for workers and passersby.

Easy Project Monitoring

The scaffolding provided an advantage for supervisors and project managers to monitor the progress of the work and make quick adjustments when needed.

Professional Appearance

For a reputable construction company like Keystone Contracting Corp, using scaffolding demonstrates a commitment to safety, professionalism, and a high standard of work.

Client Testimonial

“Keystone Contracting Corp’s choice of utilizing scaffolding for our historic building’s restoration was a brilliant decision. The company’s attention to safety and customization ensured efficient work, and the project’s success owes much to their meticulous planning and execution.”

Key Takeaways

Keystone Contracting Corp’s partnership with a scaffolding rental service proved our commitment to safety, efficiency, and top-notch services. The case study provided insight into the importance of quality scaffolding solutions to ensure the timely completion of the project. Apart from this, the equipment ensured the success of a rather complex renovation project while maintaining a priority of workers’ safety.

Contact Us

A look at our case study and implementation process proves our commitment to client satisfaction and why we are the leading scaffolding rental company in the city. So whether you need our services for long term or short term, we are the best option for you.

Contact us today at our landline number +1 718-256-3656 or send us a mail at keystoneofficeny@gmail.com or simply fill out the contact form on our website to enable you to request a quote or schedule a consultation with us.  We would love an opportunity to work with you.

Have Any Question For Project Plan In Your Mind?

Scroll to Top